The Andromeda Strain - Crichton Michael. Страница 14

"Be careful," Manchek said. "This is an open circuit."

"I am aware of that. Will you order up a 7-12?"

"I'll try. You want it now?"

"Yes, now."

"Piedmont?"

"Yes."

"You have the satellite?"

"Yes, we have it."

"All right," Manchek said. "I'll put through the order."

8. Directive 7-12

DIRECTIVE 7-12 WAS A PART OF THE FINAL Wildfire Protocol for action in the event of a biologic emergency. It called for the placement of a limited thermonuclear weapon at the site of exposure of terrestrial life to exogenous organisms. The code for the directive was Cautery, since the function of the bomb was to cauterize the infection- to burn it out, and thus prevent its spread.

As a single step in the Wildfire Protocol, Cautery had been agreed upon by the authorities involved- Executive, State, Defense, and AEC- after much debate. The AEC, already unhappy about the assignment of a nuclear device to the Wildfire laboratory, did not wish Cautery to be accepted as a program; State and Defense argued that any aboveground thermonuclear detonation, for whatever purpose, would have serious repercussions internationally.

The President finally agreed to Directive 7-12, but insisted that he retain control over the decision to use a bomb for Cautery. Stone was displeased with this arrangement, but he was forced to accept it; the President had been under considerable pressure to reject the whole idea and had compromised only after much argument. Then, too, there was the Hudson Institute study.

The Hudson Institute had been contracted to study possible consequences of Cautery. Their report indicated that the President would face four circumstances (scenarios) in which he might have to issue the Cautery order. According to degree of seriousness, the scenarios were:

1. A satellite or manned capsule lands in an unpopulated area of the United States. The President may cauterize the area with little domestic uproar and small loss of life. The Russians may be privately informed of the reasons for breaking the Moscow Treaty of 1963 forbidding aboveground nuclear testing.

2. A satellite or manned capsule lands in a major American city. (The example was Chicago.) The Cautery will require destruction of a large land area and a large population, with great domestic consequences and secondary international consequences.

3. A satellite or manned capsule lands in a major neutralist urban center. (New Delhi was the example.) The Cautery will entail American intervention with nuclear weapons to prevent further spread of disease. According to the scenarios, there were seventeen possible consequences of American-Soviet interaction following the destruction of New Delhi. Twelve led directly to thermonuclear war.

4. A satellite or manned capsule lands in a major Soviet urban center. (The example was Stalingrad.) Cautery will require the United States to inform the Soviet Union of what has happened and to advise that the Russians themselves destroy the city. According to the Hudson Institute scenario, there were six possible consequences of American-Russian interaction following this event, and all six led directly to war. It was therefore advised that if a satellite fell within Soviet or Eastern Bloc territory the United States not inform the Russians of what had happened. The basis of this decision was the prediction that a Russian plague would kill between two and five million people, while combined Soviet-American losses from a thermonuclear exchange involving both first and second-strike capabilities would come to more than two hundred and fifty million persons.

As a result of the Hudson Institute report, the President and his advisers felt that control of Cautery, and responsibility for it, should remain within political, not scientific, hands. The ultimate consequences of the President's decision could not, of course, have been predicted at the time it was made.

Washington came to a decision within an hour of Manchek's report. The reasoning behind the President's decision has never been clear, but the final result was plain enough:

The President elected to postpone calling Directive 7-12 for twenty-four to forty-eight hours. Instead, he called out the National Guard and cordoned off the area around Piedmont for a radius of one hundred miles. And he waited.

9. Flatrock

MARK WILLIAM HALL, M.D., SAT IN THE TIGHT rear seat of the F- 104 fighter and stared over the top of the rubber oxygen mask at the file on his knees. Leavitt had given it to him just before takeoff- a heavy, thick wad of paper bound in gray cardboard. Hall was supposed to read it during the flight, but the F-104 was not made for reading; there was barely enough room in front of him to hold his

I hands clenched together, let alone open a file and read.

Yet Hall was reading it.

On the cover of the file was stenciled WILDFIRE, and underneath, an ominous note:

THIS FILE IS CLASSIFIED TOP SECRET. 

Examination by unauthorized persons is a criminal offense punishable by fines and imprisonment up to 20 years and $20,000.

When Leavitt gave him the file, Hall had read the note and whistled.

"Don't you believe it," Leavitt said.

"Just a scare?"

"Scare, hell," Leavitt said. "If the wrong man reads this file, he just disappears."

"Nice."

"Read it," Leavitt said, "and you'll see why."

The plane flight had taken an hour and forty minutes, cruising in eerie, perfect silence at 1.8 times the speed of sound. Hall had skimmed through most of the file; reading it, he had found, was impossible. Much of its bulk of 274 pages consisted of cross-references and interservice notations, none of which he could understand. The first page was as bad as any of them:

  THIS IS PAGE 1 OF 274 PAGES

PROJECT: WILDFIRE

AUTHORITY: NASA/AMC

CLASSIFICATION: TOP SECRET (NTK BASIS)

PRIORITY: NATIONAL (DX)

SUBJECT: Initiation of high-security facility to prevent dispersion of toxic extraterrestrial agents.

CROSSFILE: Project CLEAN, Project ZERO CONTAMINANTS, Project CAUTERY

SUMMARY OF FILE CONTENTS:

By executive order, construction of a facility initiated January 1965. Planning stage March 1965. Consultants Fort Detrick and General Dynamics (EBD) July 1965. Recommendation for multistory facility in isolated location for investigation of possible or probable contaminatory agents. Specifications reviewed August 1965. Approval with revision same date. Final drafts drawn and filed AMC under WILDFIRE (copies Detrick, Hawkins). Choice of site northeast Montana, reviewed August 1965. Choice of site southwest Arizona, reviewed August 1965. Choice of site northwest Nevada, reviewed September 1965. Nevada site approved October 1965.

Construction completed July 1966. Funding NASA, AMC, DEFENSE (unaccountable reserves). Congressional appropriation for maintenance and personnel under same.

Major alterations: Millipore filters, see page 74. Self-destruct capacity (nuclear), page 88. Ultraviolet irradiators removed, see page 81. Single Man Hypothesis (Odd Man Hypothesis), page 255.

PERSONNEL SUMMARIES HAVE BEEN ELIMINATED FROM THIS FILE. PERSONNEL MAY BE FOUND IN AMC (WILDFIRE) FILES ONLY.

The second page listed the basic parameters of the system, as laid down by the original Wildfire planning group. This specified the most important concept of the installation, namely that it would consist of roughly similar, descending levels, all underground. Each would be more sterile than the one above.

  THIS IS PAGE 2 OF 274 PAGES

PROJECT: WILDFIRE

PRIMARY PARAMETERS

1. THERE ARE TO BE FIVE STAGES:

Stage 1: Non-decontaminated, but clean. Approximates sterility of hospital operating room or NASA clean room. No time delay of entrance.

Stage II: Minimal sterilization procedures: hexachlorophene and methitol bath, not requiring total immersion. One-hour delay with clothing change.

Stage III: Moderate sterilization procedures: total-immersion bath, UV irradiation, followed by two-hour delay for preliminary testing. Afebrile infections of UR and GU tracts permitted to pass. Viral symptomatology permitted to pass.

Stage IV: Maximal sterilization procedures: total immersion in four baths of biocaine, monochlorophin, xantholysin, and prophyne with intermediate thirty-minute UV and IR irradiation. All infection hafted at this stage on basis of symptomatology or clinical signs. Routine screening of all personnel. Six-hour delay.

Stage V: Redundant sterilization procedures: no further immersions or testing, but destruct clothing x2 per day. Prophylactic antibiotics for forty-eight hours. Daily screen for superinfection, first eight days.

2. EACH STAGE INCLUDES: 

1. Resting quarters, individual  

2. Recreation quarters, including movie and game room 

3. Cafeteria, automatic 

4. Library, with main journals transmitted by Xerox or TV from main library Level 1.

5. Shelter, a high-security antimicrobial complex with safety in event of level contamination.

6. Laboratories: a) biochemistry, with all necessary equipment for automatic amino-acid analysis, sequence determination, O/R potentials, lipid and carbohydrate determinations on human, animal, other subjects. b) pathology, with EM, phase and LM, microtomes and curing rooms. Five full-time technicians each level. One autopsy room. One room for experimental animals. c) microbiology, with all facilities for growth, nutrient, analytic, immunologic studies. Subsections bacterial, viral, parasitic, other. d) pharmacology, with material for dose-relation and receptor site specificity studies of known compounds. Pharmacy to include drugs as noted in appendix. e) main room, experimental animals. 75 genetically pure strains of mice; 27 of rat; 17 of cat; 12 of dog; 8 of primate. f) nonspecific room for previously unplanned experiments.

7. Surgery: for care and treatment of staff, including operating room facilities for acute emergencies.

8. Communications: for contact with other levels by audiovisual and other means.

  COUNT YOUR PAGES

REPORT ANY MISSING PAGES AT ONCE

COUNT YOUR PAGES